Back to Job Board

Construction Schedule Expert – Hickam AFB, Hawaii  (ID#15401)

Cherokee Nation Management & Consulting (CNMC) is a versatile small business that provides advisory & assistance services in research, experimental development, technology implementation, and program management. CNMC has expertise in a wide-range of technical disciplines including engineering, environmental, information and asset management, along with a variety of physical and life sciences. The company is an integral part of the Technology Division’s portfolio of companies. Wholly owned by the Cherokee Nation, CNMC is part of the Cherokee Nation Businesses family of companies.

For more company information, visit our site at www.cherokee-cnmc.com

Clients include Pacific Air Forces (PACAF), the Air Force Installation Mission Support Center (AFIMSC) Det 2, the Air Force Civil Engineer Center (AFCEC) at Hickam AFB, Hawaii (Joint Base Pearl Harbor-Hickam, JBPHH), and Air Force locations throughout the Pacific.

Job Description:

Cherokee Nation Businesses is seeking a senior-level Construction Scheduling Expert to help analyze and expedite Military Construction (MILCON) and large repair and modernization (SRM) projects throughout the Pacific. This subject matter expert (SME) will advise Air Force clients and Cherokee colleagues on paths forward in building future facilities throughout the Pacific (e.g., US facilities at host nation bases, new basing actions, and exercise-related facility improvements).

 

Clients include Pacific Air Forces (PACAF), the Air Force Installation Mission Support Center (AFIMSC) Det 2, the Air Force Civil Engineer Center (AFCEC), Naval Facilities Engineering Command (NAVFAC), US Army Corps of Engineers (USACE), and Air Force locations throughout the Pacific. Primary work location is at HQ PACAF, Hickam AFB, Hawaii (Joint Base Pearl Harbor-Hickam, JBPHH), however, working from Guam might be acceptable.

Essential Duties and Responsibilities (Deliverables):

Includes the following (Other duties may be assigned):

  • Participate in in-process reviews for project planning, design, and execution throughout the construction lifecycle including:
    • Participate in design reviews (i.e. 35%, 65%, 95%) and construction milestones
    • Develop construction schedules using various methods, including available modeling tools
    • Analyze project schedules developed by other professionals/peers
    • Identify and research factors affecting project costs and schedule
    • Provide forensic analysis and documentation as needed
  • Gather relevant documents; independently research industry best practices especially those affecting work in remote or non-US locations
  • Assist in writing specifications for all types of construction
  • Analyze strengths and risks of others’ estimates based on RFP, proposal, blueprints, specs, or other documents
  • Work with project managers and other consultants to find ways to reduce costs/schedule without endangering the success of the project
  • Create and maintain strong relationships with clients
  • Travel up to 25% to meet with contractors, customers, and team members

Supervisory/Management Authority:

  • This is not a supervisory position, but will require providing mentorship, peer review assistance, and technical and professional leadership to colleagues (Cherokee, other contractors, and government personnel).

Education and/or Experience:

  • Bachelor’s degree in construction management, civil engineering, architecture or a related field (for the right candidate we may be able to waive this requirement)
  • 10+ years of relevant experience (preferably in aviation, transportation, and public works)
  • 5+ years of experience in the planning or managing of engineering design or construction, or experience in overseeing large US federal government engineering projects
  • Experience with similar projects (e.g., new aircraft parking aprons and taxiways, hangars and support facilities, fuel systems, road improvements, fire protection, offices and secure space, and extensive earthwork)
  • Ability to obtain and maintain a US DoD–issued CAC card (i.e., NACI/SF85); current or prior SECRET clearance preferred
  • PMP is a plus

Knowledge, Skills and Abilities:

  • Well versed in the construction industry; current with the latest construction estimating/scheduling technology and techniques
  • Advanced knowledge of construction principles
  • Excellent organizational skills for construction project management and presenting findings to SMEs at construction companies and architectural/engineering (A/E) firms
  • Professional written and oral communication skills
  • WBDG, UFC, AFI, and other resources to identify and define project and process requirements

WORK ENVIRONMENT

  • This position is primarily performed in an office environment on US military base (HQ PACAF building at Hickam AFB, HI)
  • Requires international travel less than 25%.

With $400 million in annual revenue, 20% growth per year, approximately 950+ active contracts serving 60+ government agencies in 25 countries, 47 states, 2 territories and 2000+ employees, Cherokee Nation Businesses’ (CNB) group of Federal Contracting Section 8(a) companies is well positioned to deliver expertise needed to solve complex technical issues. Federal Solutions provides an array of services for 12 of the 15 cabinet-level departments and agencies – from applications and data services to cybersecurity and national defense.

Why consider Cherokee Nation and our Federal Solutions business? Here are some great resources highlighting what we do and compelling reasons for joining our team!

http://cherokeenationbusinesses.com/Pages/home.aspx

http://cherokeenationbusinesses.com/careers/Pages/home.aspx

http://cherokeenationbusinesses.com/federalSolutions/Pages/overview.aspx

 

 

Applicants selected will be subject to a U.S. Government security investigation and must meet eligibility requirements for access to classified information.

We are an equal opportunity/affirmative action employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability, protected Veteran status, gender identity and sexual orientation. If you’d like more information about your EEO rights as an applicant under the law, please copy and paste the links to the following two sites: EEO Statement | EEO Poster

If you are an individual with a disability and require a reasonable accommodation to complete any part of the application process, or are limited in the ability or unable to access or use this online application process and need an alternative method for applying, you may email “CNB.Compliance@cn-bus.com” for assistance. This email address is for accommodation requests only and cannot be used to inquire about the application process or status.

For Pay Transparency Non Discrimination provision, please copy and paste the following link: Pay Transparency Nondiscrimination Provision

We maintain an Affirmative Action Plan for the purpose of proactively seeking employment and advancement for qualified protected veterans and individuals with disabilities. Upon request, we will schedule time to make our Affirmative Action Plan accessible. If you are interested, please submit a written request with the email subject line: 2018 Request to View Affirmative Action Plan to the Compliance Administrator at “CNB.Compliance@cn-bus.com” This email box is not for resumes or follow up on job applications.